Your form has a new entry.     Here are the results.    
  
| Date | Jun 30, 2025 | 
|---|---|
| First and Last Name | Lyons | 
| Entry Type | GENERAL PASS ON | 
| Your entry | |
| B-Shift fridge was fixed. Shop dryers were installed. It was recommended that we only use 1 at a time until electrical work can be done to install the proper wiring. Carpet tiles in the bunkroom were replaced. Someone was in to look at the station alerting. He left without report but it has been functioning normally all day. | |
| IF DEFECT, WAS A REPAIR REQUEST MADE? | YES | 
 
