Here are the results.
Date | Feb 13, 2018 |
First and Last Name | Lt. Branch |
Entry Type | GENERAL PASS ON |
Your entry | |
The multi-gas meter docking station (at the Watch Desk) was connected to the online system with the gas for testing. It is now fully operational as intended. | |
IF DEFECT, WAS A REPAIR REQUEST MADE? | NO |
No comments:
Post a Comment