Here are the results.
Date | Nov 03, 2019 |
First and Last Name | Chief Ryman |
Entry Type | GENERAL PASS ON |
Your entry | |
There are 3 large (bigger than M size) oxygen cylinders in the SCBA room for the petrogen. One of them should be close to finished. They are fair game for additional training. There are also 3 10 ft pieces of heavy steel (1 outside and 2 in front of E715B), and some black heating pipe that can be cut. All of the above is fair game. The cylinders will likely be picked up towards the end of the week. There are also 2 gas cans by the basketball hoop outside for fuel. There is also an impalement propr and rebar in front of the engine. Feel free to utilize, but please save some rebar for other BVFD personnel I need to get through it. | |
IF DEFECT, WAS A REPAIR REQUEST MADE? | NO |
No comments:
Post a Comment