Here are the results.
Date | Dec 14, 2019 |
First and Last Name | Chief Ryman |
Entry Type | APPARATUS DEFECT |
APPARATUS DEFECT | |
UNIT | PE715B (PIERCE) |
Your entry | |
1.75" on 350' (#01-14) line failed on 1st burn evolution, was connected directly to discharge. Replaced with length from shelf #B-14-001. Thea submitted for replacement. | |
IF DEFECT, WAS A REPAIR REQUEST MADE? | YES |
No comments:
Post a Comment