Here are the results.
Date | Oct 25, 2020 |
First and Last Name | Chief Ryman |
Entry Type | GENERAL PASS ON |
Your entry | |
The new squad was placed in service today. The only thing not moved over as of right now is the contents of the blue tool box. I have tool box organizer foam. If anyone is particularly interested in cutting the foam to organize the box, etc. please reach out. Otherwise I'll get to it sometime this week. Two Aztec kits added to inventory. 1 in each rigging bag. Rear slide out should continue to not be pulled out unless absolutely necessary. The unit is in the defect reporting system. Any apparatus defects should be submitted that way. Any equipment things can come to me for now. | |
IF DEFECT, WAS A REPAIR REQUEST MADE? | NO |
No comments:
Post a Comment