Here are the results.
Date | Nov 16, 2020 |
First and Last Name | Robert Marsh |
Entry Type | APPARATUS DEFECT |
APPARATUS DEFECT | |
UNIT | RS715 (E-ONE) |
Your entry | |
Switched into RRS1 so that New Rescue E One Rescue Squad can go to Patriot for Warranty work. We were instructed to take out all the cribbing in the back, leaving just one piece of each individual size in the compartment. Switch over list is saved to desktop on computer in watch office. RRS1 = "A" Side of Hurst Pump not working properly. It took 30 seconds to open spreader on this side vs 15 seconds on Orange "B" Line. Written up. In order to power up Hurst pump you must turn on Breaker 21 in panel. You must also turn if off this way. Apparently on/off switch on pump is broken. Two Air Bag Bags set up in walk in area. One complete set up for a 45 min cylinder (no threads) and One complete set up for a 60 min cylinder (threads). Couldn't get Diesel Generator to stay running. Not concerned as half of the things it powers on this thing don't work. If we are missing something you want, let me know. I can swing by patriot and bring it with me to work on Thursday. | |
IF DEFECT, WAS A REPAIR REQUEST MADE? | YES |
No comments:
Post a Comment