Here are the results.
| Date | Mar 25, 2021 |
| First and Last Name | BRAD DISHAROON |
| Entry Type | GENERAL PASS ON |
| Your entry | |
| Concrete contractors came out to take core samples and measurements in approximately 8 places on the front ramp (marked in orange). They only needed a garden hose and for us to be out of the way. We ran all of the apparatus out of the back of the station. I didn't get a chance to talk with them before they left about their progress but I imagine they will be doing the same thing Friday 3/26 in the rear of the station. | |
| IF DEFECT, WAS A REPAIR REQUEST MADE? | NO |
No comments:
Post a Comment