Friday, December 2, 2022

Dec 02, 2022 - GENERAL PASS ON

Your form has a new entry.

Here are the results.

DateDec 02, 2022
First and Last NameMcDonald
Entry TypeGENERAL PASS ON
Your entry
PE715 switched back into frontline wagon. Currently missing some stream lights, box lights, and the RAD meter.
Gracefield Road keys: Found set for truck on RAT 6, but now missing the set off A715.
New fuel key delivered. Key can be easily found in Captain's office.
HVAC issue is ongoing. Multiple contractors in station but could not find a solution. Issues occurred again this evening after contractors left.
Absorbent and 2-Cycle fuel picked up from small tools.
Damaged 50' and 100' sections of 4" dropped off at small tools. New hose picked up and placed in storage.
Blowhard Fan #4 off T715 dropped off at small tools. Loaner given out.
IF DEFECT, WAS A REPAIR REQUEST MADE?NO

No comments: