Here are the results.
Date | Mar 25, 2023 |
First and Last Name | Michael Gignac |
Entry Type | APPARATUS DEFECT |
APPARATUS DEFECT | |
UNIT | PE715 (PIERCE) |
Your entry | |
All compartment and cab contents were transferred over from the Pierce engine along with 50 section of 4" supply line connected to the Humat, the 400' 1 1/2" and the two 1 1/2" Crosslays. The ladders, hard sleeves, low level strainer and Humat(minus wrench) belong to RE11. RE11 2 1/2" and 1 3/4" lines are rolled up behind ambulance along with nozzles. | |
IF DEFECT, WAS A REPAIR REQUEST MADE? | NO |
No comments:
Post a Comment