Here are the results.
| Date | Apr 01, 2023 |
| First and Last Name | Hare |
| Entry Type | APPARATUS DEFECT |
| APPARATUS DEFECT | |
| UNIT | OTHER |
| OTHER UNIT | |
| SPECIFY UNIT ID | PE715 (RE11) |
| Your entry | |
| L Rear Discharge Bleeder line on officers side pump panel ruptured after charging the 400. Unable to charge L Rear discharge without significant water/pressure loss. 400 ft 1.5 inch attack line moved to Center Rear discharge, 300 ft 2 inch attack line moved to L rear discharge but remains disconnected. | |
| IF DEFECT, WAS A REPAIR REQUEST MADE? | YES |
No comments:
Post a Comment