Thursday, May 18, 2023

May 18, 2023 - GENERAL PASS ON

Your form has a new entry.

Here are the results.

DateMay 18, 2023
First and Last NameAdams
Entry TypeGENERAL PASS ON
Your entry
All the old 1.75" and 2.5" hose off the rack was taken up to Small Tools and exchanged. We brought back new 1.5", 2", 2.5" needed to outfit the all the preconnects on the county pierce. All attack lines (county engine) have been loaded with brand new hose plus a few extra sections of 1.5 and 2". The 300' 2" line has been switched to a 300' 1.5". Per Grierson, We will have to be patient acquiring new elkhart XD nozzles. Currently there are spare metro 1 nozzles (place holders) on the crosslays and the 300'/400' were packed leaving room to add the elkharts that are currently on the corp engine.
Additionally, we brought back "missing" equipment needed to have both units equipped. Capt Kitner has the list and there is a list in the Captains office. Several items will need to be labeled.
IF DEFECT, WAS A REPAIR REQUEST MADE?NO

No comments: