Here are the results.
Date | Jan 06, 2018 |
First and Last Name | Lt. Branch |
Entry Type | APPARATUS DEFECT |
APPARATUS DEFECT | |
UNIT | PE715 (CRIMSON) |
Your entry | |
PE715 switched from RE9 into RE4. RE9 problems: the master discharged gauge spun around at least 3 times and rested at 500 psi on the fire ground and would not return to 0 psi when turned off. The TRV warning was activated as well. It was placed O.O.S. due to a Master Discharge gauge that was not operating properly. Everything was taken off of RE9 except 200 feet of 4 inch ( which may need to come off prior to it leaving sta. 15), 200 feet of three inch and all of the attack lines. Literally everything else was switched. | |
IF DEFECT, WAS A REPAIR REQUEST MADE? | YES |
No comments:
Post a Comment