Here are the results.
Date | Jan 06, 2018 |
First and Last Name | Lt. Branch |
Entry Type | GENERAL PASS ON |
Your entry | |
-SCBA's regulators were cleaned, disinfected and documented. - A Metro II nozzle was left on the fire ground. Efforts will be conducted to locate the missing Metro II nozzle. A 100 psi nozzle was placed on the second high rise pack for now. | |
IF DEFECT, WAS A REPAIR REQUEST MADE? | NO |
No comments:
Post a Comment